Attached are photos of the welding work being done to my trailer. The first stall is being converted to a shower space. The manger is being removed (see photo). The welder will put in a steel wall to close the manger back up... We decided to just screw the access doors shut (drop down feed door and manger access). A new wall is being constructed (see photo) to separate the shower area from the horse area. The tubing is in place, and it will be covered with steel. It has a walk-thru door. He put a battery box on the exterior (see photo). He also fixed a major weld seam that had popped open (see photo). So that's where my project is at...
Edited by NoSpam 2005-05-26 9:21 AM
|